A method statement is a sequence of steps taken to complete a work task in a safe manner. The method statement should be written by a person that is competent in the task.
When a method statement is prepared, the risks are identified during the work sequence. Steps taken to reduce the risk are then determined. Next a series of steps are written down that are to be followed by the person or persons carrying out the works. This sequence of steps should include all health and safety aspects, such as personal protective equipment requirements, tools and equipment, and importantly, safety related equipment such as scaffolding.
All control measures that have been determined whilst preparing a method statement and/or risk assessment should be used as a "tool box" talk prior to the works being carried out. By performing an overview of the method statement and/or risk assessment during the "tool box" talk, everyone involved will have a clear understanding of the work to be carried out, as well as the safe work method sequences and safety equipment required.
Click Here For an Example Method Statement
No comments:
Post a Comment